2022 Quarters 1-4
2022 Quarter 4: October to December 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (116.6 KB)
- Imperial Oil and Gas - Seismic IMP1 PDF (362.7 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (364.9 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (361.4 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing IMP4 PDF (410.2 KB)
- Tamboran - Amungee Delineation - ORI11-3 PDF (69.0 KB)
- Tamboran - Amungee Multiwell - ORI10 PDF (69.9 KB)
- Tamboran - Amungee NW - ORI7-2 PDF (69.9 KB)
- Tamboran - Beetaloo EMP ORI8-2 PDF (70.0 KB)
- Tamboran - Kalala S1 Maintenance and Monitoring - ORI9-2 PDF (68.8 KB)
- Tamboran - Kyalla 117 Drilling and Stimulation - ORI3-2 PDF (70.2 KB)
- Tamboran - Kyalla 117 N2 civils - ORI1-1 PDF (69.6 KB)
- Tamboran - Kyalla 117 Water Bore - ORI-2019 PDF (70.3 KB)
- Tamboran - Kyalla multiwell - ORI6-3 PDF (70.8 KB)
- Tamboran - Velk 76 S2 civil - ORI4-1 PDF (70.2 KB)
- Tamboran - Velkerri 76 S2 Drilling, HF and well testing - ORI5-4 PDF (70.8 KB)
- Tamboran - Velkerri 76 S2 Water bore - ORI2-1 PDF (70.9 KB)
- Tamboran - Velkerri 98 N1 water bore PDF (70.3 KB)
- Sweatpea Petroleum Limited - Civils and waterbore - SWP2-3 PDF (70.2 KB)
- Sweatpea Petroleum Limited - Seismic - SWP1-4 PDF (69.9 KB)
- Sweatpea Petroleum Limited - Well Drilling, Hydraulic Fracture Stimulation and Well Testing - SWP4-3 PDF (94.4 KB)
- Santos QNT Pty Ltd – Dukas 1 Gas Well PDF (124.4 KB)
- Santos QNT Pty Ltd – Tanumbirini North Water Bore Monitoring Program PDF (142.1 KB)
- Santos QNT Pty Ltd – Water Bore Monitoring Program PDF (140.4 KB)
- Santos QNT Pty Ltd – 2019 Civil and Seismic Program) PDF (106.4 KB)
- Santos QNT Pty Ltd – 2019-20 McArthur Hydraulic Fracturing Program STO3-8 PDF (107.6 KB)
- Santos QNT Pty Ltd – McArthur Basin 2019 Drilling Program STO2-7 PDF (201.8 KB)
- Central Petroleum Limited – Dingo Gas Field and Surprise Oil Field PDF (219.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (216.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (109.9 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (215.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (114.7 KB)
- Central Petroleum Limited - NT Drilling PDF (252.8 KB)
2022 Quarter 3: July to September 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (117.5 KB)
- Origin – Amungee NW ORI7 PDF (44.2 KB)
- Origin – Amungee multiwell ORI10 PDF (44.2 KB)
- Origin – Kalala S1 ORI9 PDF (42.8 KB)
- Origin – Kyalla Multiwell ORI6 PDF (45.1 KB)
- Origin – Kyalla Water Bore EMP PDF (44.3 KB)
- Origin – Kyalla N2 Civils Construction ORI1 PDF (43.5 KB)
- Origin – Kyalla N2 Drilling, Stimulation and Well Testing ORI3 PDF (44.2 KB)
- Origin – Velkerri 98 N1 Water Bore PDF (44.9 KB)
- Origin – Velkerri 76 S2 Drilling, Stimulation and Well Testing ORI5 PDF (44.7 KB)
- Origin – Velkerri 76 S2 Water Bore - ORI2 PDF (44.5 KB)
- Origin – Velkerri 76 S2 Civil Construction ORI4 PDF (44.2 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (432.6 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (239.3 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (239.7 KB)
- Imperial Oil and Gas – Seismic IMP001-03 PDF (238.8 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (176.6 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (147.5 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (122.2 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program STO1-4 PDF (122.3 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program STO3-8 PDF (121.8 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program STO2-7 PDF (199 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (70.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (72.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (71.9 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (71.0 KB)
- Central Petroleum Limited - Palm Valley Field PDF (107.0 KB)
- Central Petroleum Limited - NT Drilling PDF (260.7 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (151.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (161.4 KB)
- Sweetpea Petroleum Limited - Well Drilling, Hydraulic Fracture Stimulation and Well Testing PDF (188.5 KB)
2022 Quarter 2: April to June 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (115.8 KB)
- Central Petroleum Limited - NT Drilling PDF (101.3 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (95.3 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (95.5 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (102.6 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (99.5 KB)
- Central Petroleum Limited - Palm Valley Field PDF (105.2 KB)
- Imperial Oil and Gas – Drilling IMP2 PDF (374.4 KB)
- Imperial Oil and Gas – Hydraulic Fracturing IMP3 PDF (374.0 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (376.5 KB)
- Imperial Oil and Gas – Seismic PDF (374.8 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (203.2 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (208.2 KB)
- Santos QNT Pty Ltd - 2019 Civil & Seismic Program PDF (131.5 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (172.3 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (134.6 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (162.6 KB)
- Origin – Amungee Multiwell ORI PDF (73.9 KB)
- Origin – Amungee NW-1H ORI7 PDF (73.9 KB)
- Origin – Beetaloo W-1 ORI8 PDF (74.0 KB)
- Origin – Kalala S1 ORI9 PDF (72.7 KB)
- Origin – Kyalla N2 Drilling, Stimulation and Well Test ORI3 PDF (73.8 KB)
- Origin – Kyalla Multiwell ORI6 PDF (74.7 KB)
- Origin – Kyalla N2 Civil Construction ORI1 PDF (73.2 KB)
- Origin – Kyalla Water Bore EMP PDF (73.9 KB)
- Origin – Velkerri 76 S2 Civil Construction ORI4 PDF (73.8 KB)
- Origin – Velkerri 76 S2 Drilling, Stimulation and Well Testing - ORI5 PDF (74.4 KB)
- Origin – Velkerri 76 S2 Water Bore - ORI2 PDF (74.5 KB)
- Origin – Velkerri 98 N1 Water Bore PDF (74.2 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (212.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.6 KB)
2022 Quarter 1: January to March 2022
Recordable incident reports received this quarter:
- Peak Helium - Seismic PDF (115.7 KB)
- Origin - Amungee NW-1H EP98 - ORI7 PDF (63.5 KB)
- Origin - Beetaloo W-1 EMP - ORI8 PDF (65.5 KB)
- Origin - Kyalla 117 N2 Civil Construction - ORI1 PDF (63.1 KB)
- Origin - Kyalla 117 N2 Drilling, Stimulation and Well Test - ORI3 PDF (63.7 KB)
- Origin - Kyalla 117 Water Bore PDF (63.8 KB)
- Origin - Kyalla Multiwell - ORI6 PDF (66.3 KB)
- Origin - Velkerri 76 S2 Civil Construction - ORI4 PDF (63.7 KB)
- Origin - Velkerri 76 S2 Drilling, Stimulation and Well Testing - ORI5 PDF (64.3 KB)
- Origin - Velkerri 76 S2 Water Bore - ORI2 PDF (64.4 KB)
- Origin - Velkerri 98 N1 Water Bore PDF (63.7 KB)
- Origin - Kalala S Maintenance and Monitoring EMP EP98 - ORI9 PDF (64.2 KB)
- Central Petroleum Limited - NT Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (95.7 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - proposed well sites WM25 and WM26 PDF (90.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (106.5 KB)
- Central Petroleum Limited - Mereenie Field workover and well head, equipment, safety system and gathering line activities PDF (99.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (101.5 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (365.5 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (363.2 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (655.3 KB)
- Imperial Oil and Gas - Seismic PDF (362.7 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (198.3 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (198.1 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (102.3 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (136.1 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.0 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (122.2 KB)
- Sweetpea Petroleum Limited - Civil Construction and Water Bore Drilling PDF (151.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
Give feedback about this page.
Share this page:
URL copied!