2021 Quarters 1-4
2021 Quarter 4: October to December 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (95.4 KB)
- Central Petroleum Limited - Dingo and Surprise Oil Field PDF (95.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed well sites WM25 and WM26 PDF (95.9 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (108.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, equipment, safety system and gathering line activities PDF (100.4 KB)
- Central Petroleum Limited - Palm Valley Field PDF (108.4 KB)
- Imperial Oil and Gas - Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (363.4 KB)
- Imperial Oil and Gas - Drilling IMP3 PDF (362.2 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (364.0 KB)
- Imperial Oil and Gas - Seismic PDF (361.1 KB)
- Origin - Amungee NW-1H EP98 PDF (59.4 KB)
- Origin Beetaloo W-1 EMP PDF (59.6 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.1 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.7 KB)
- Origin - Kyalla 117 Water bore PDF (59.8 KB)
- Origin - Kyalla multiwell PDF (60.3 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.7 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (60.2 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.3 KB)
- Origin - Velkerri 98 N1 water bore PDF (59.6 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (515.7 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (444.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (525.4 KB)
- Santos QNT Pty Ltd - 2019 Civil and Seismic Program PDF (271.0 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (522.4 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (131.2 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
2021 Quarter 3: July to September 2021
Recordable incident reports received this quarter:
- Central Petroleum Limited - Northern Territory Drilling PDF (59.9 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (80.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (82.2 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (184.4 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Central Petroleum Limited - Palm Valley PDF (128.2 KB)
- Imperial Oil and Gas – Hydraulic Fracturing IMP3 PDF (361.6 KB)
- Imperial Oil and Gas – Seismic, Drilling and Hydraulic Fracturing - IMP4 PDF (363.8 KB)
- Imperial Oil and Gas - Hydraulic Fracturing IMP2 PDF (409.3 KB)
- Imperial Oil and Gas - Seismic PDF (361.0 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (137.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (121.1 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (148.9 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (103.5 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (102.8 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Origin - Amungee NW-1H EP98 PDF (60.3 KB)
- Origin - Kyalla 117 N2 civil construction PDF (62.2 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (62.4 KB)
- Origin - Kyalla 117 Water bore PDF (62.5 KB)
- Origin - Kyalla multiwell PDF (63.0 KB)
- Origin - Velkerri 76 S2 civil construction PDF (61.8 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (62.3 KB)
- Origin - Velkerri 76 S2 Water bore PDF (62.5 KB)
- Origin - Velkerri 98 N1 water bore PDF (63.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.4 KB).
2021 Quarter 2: April to June 2021
Recordable incident reports received this quarter:
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program PDF (104.4 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (117.5 KB)
- Santos QNT Pty Ltd - McArthur Basin 2019 Drilling Program PDF (128.5 KB)
- Santos QNT Pty Ltd - 2019 Civils and Seismic Program PDF (99.6 KB)
- Santos QNT Pty Ltd - 2019-20 McArthur Basin Hydraulic Fracturing Program PDF (99.2 KB)
- Santos QNT Pty Ltd - Water Bore Monitoring Program PDF (132.9 KB)
- Imperial Oil and Gas - Drilling PDF (129.6 KB)
- Imperial Oil and Gas - Hydraulic Fracturing PDF (129.3 KB)
- Imperial Oil and Gas - Seismic PDF (130.0 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (78.6 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (80.1 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (181.2 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (80.6 KB)
- Central Petroleum Limited - Palm Valley PDF (78.5 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (79.7 KB)
- Origin - Kyalla 117 N2 civil construction PDF (63.8 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (81.8 KB)
- Origin - Kyalla 117 Water bore PDF (64.0 KB)
- Origin - Kyalla multiwell PDF (64.6 KB)
- Origin - Velkerri 76 S2 civil construction PDF (63.4 KB)
- Origin - Velkerri 76 S2 Drilling, stimulation and well test PDF (63.9 KB)
- Origin - Velkerri 76 S2 Water bore PDF (64.0 KB)
- Origin - Velkerri 98 N1 water bore PDF (65.2 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.6 KB).
2021 Quarter 1: January to March 2021
Recordable incident reports received this quarter:
- Origin - Velkerri 98 N1 water bore PDF (60.8 KB)
- Origin - Kyalla 117 N2 civil construction PDF (59.3 KB)
- Origin - Kyalla 117 N2 Drilling, stimulation and well test PDF (59.6 KB)
- Origin - Kyalla 117 N2 Water bore PDF (59.6 KB)
- Origin - Kyalla multiwell PDF (60.1 KB)
- Origin - Velkerri 76 S2 civil construction PDF (59.4 KB)
- Origin - Velkerri 76 S2 Drilling Stimulation and Well Testing PDF (60.1 KB)
- Origin - Velkerri 76 S2 Water bore PDF (60.1 KB)
- Central Petroleum Limited - Dingo Gas Field and Surprise Oil Field PDF (81.3 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field - Proposed Well Sites WM25 and WM26 PDF (108.8 KB)
- Central Petroleum Limited - Mereenie Oil and Gas Field PDF (225.1 KB)
- Central Petroleum Limited - Northern Territory Drilling Campaign PDF (79.3 KB)
- Central Petroleum Limited - Palm Valley PDF (223.2 KB)
- Central Petroleum Limited - Mereenie Field Workover and Wellhead, Equipment, Safety System and Gathering Line Activities PDF (81.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic PDF (132.0 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Seismic Supplementary PDF (131.9 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program PDF (213.4 KB)
- Imperial Oil and Gas - EP187 2020-21 Q3 Drilling Program Supplimentary PDF (164.2 KB)
- Central Petroleum Limited - Mereenie Gas Field PDF (182.2 KB)
- Origin - Beetaloo Basin Velkerri, Civil Construction EP76 S2 PDF (118.0 KB)
- Santos QNT Pty Ltd - Water bore monitoring program: Tanumbirini South, Inacumba North and Inacumba South PDF (87.7 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program Velkerri 76 EP76 PDF (66.1 KB)
- Origin - Beetaloo Sub-basin Velkerri 2019-2024 Drilling, Hydraulic fracturing and well testing Exploration Permit, EP76 PDF (66.0 KB)
- Santos QNT Pty Ltd - McArthur Basin Civil and Seismic program PDF (86.5 KB)
- Origin - Beetaloo Basin groundwater monitoring bore installation program, Kyalla EP117 PDF (64.2 KB)
- Santos QNT Pty Ltd - Dukas 1 Gas Well PDF (145.6 KB)
- Central Petroleum Limited - Palm Valley gas field PDF (237.5 KB)
- Santos QNT Pty Ltd - Tanumbirini North Water Bore Monitoring Program Environmental Management Plan PDF (91.1 KB)
- Origin- Beetaloo Basin Kyalla, Civil Construction EP117 N2 PDF (63.9 KB)
- Origin - Beetaloo Basin Kyalla drilling hydraulic fracture stimulation and well testing program EP117 N2 PDF (64.1 KB)
- Sweetpea Petroleum Limited - Seismic PDF (151.3 KB).
Give feedback about this page.
Share this page:
URL copied!