Australia-Asia Powerlink Project
This page provides information required by regulation 282 of the Environment Protection Regulations 2020.
Environmental approval holder: AAPowerlink Australia Assets Pty Ltd
Full NT EPA assessment: All documents considered by the NT EPA
NT EPA advice to minister: NT EPA advice (assessment report and draft environmental approval)
Minister's approval: Environmental approval PDF (6.1 MB)
Approval History | Documents | Date |
---|---|---|
Original approval | 14/07/2024 |
Give feedback about this page.
Share this page:
URL copied!